Apparently the Russians want to do Chernobyl all over again. Shelling a running nuclear power plant is asking for another Chernobyl. A nuclear plant needs a lot of stuff working to keep it running safely, the cooling system, the fire fighting equipment, the control room, electric power to move the control rods, and more. Shelling the plant is likely to break something essential.
If they just want to control who gets power, and turn the lights out on the Ukrainian resistance, all the Russians need do is surround the plant, wait for the operators to get hungry, and offer them food if they come out and turn the place over. Shelling is no part of this.
No comments:
Post a Comment